Industrial nature - recycling landscape

Page 1


Industrial nature - recycling landscape

Shuobing

Hybrid Question

Can habitat regeneration connect the community to the post-industrial site and the waterfront?

Hydrology Analysis

Topography Analysis

Materiality Analysis

Site

Industrial Lands Analysis

Australian Energy Generation Structure Change

Native Vegetation Zones In Site

Base map by Tong Zhang (2021,T1,Group work )

Regional Habitat Linkage

Future Structure Plan Analysis

Opportunities

& Constraints

Stage 1 - 2040 Phytoremediation

Site-wide remediation process to improve soil condition and establish landscape types.

Stage 2 - 2100

Industrial Walk

- Establish public domain connection from the WBPS and the Slio.

- Initial recovery for coastal habitats.

Stage 3 - 2200

Coastal recovery

- Creating resilient lanscape on the waterfront responding to the sea level rise

- Establish WSUD system with constructed wetland

- Establish mature planting ecosystem

Phyto-remediation Process

Phyto-remediation Typologies

2020 Section

The Silo is operating. Workers working on the port with occasional visitors that are not allowed to stay for long time.

2100 Section

Peope are allowed to get close to see the waterfront and changes of the tide. In low tide, people can see the aquatic species in the intertidal zone attaching on the woodpiles.

2200 Section

During high tide, People walks on the boardwalk on the resilient landscape waterfront. During low tide, the landscape is free for walking on ground.

Timber Pile Habitat

2020 Section

People only drive through the site. Obstructed by construction activities.

2100 Section

Kids play at the playscape. People strolling and sitting on the regenerated grassland.

2200 Section

People walks on the waterfront promenade and observe the seawall habitats.

Landscape Layers

Circulation

Topography

Public Domain

Vegetation

Recycle Materials

Wetland Plants Plants Detail Design

Location plan

Wetland Perspective

Physical Model

Plants Detail Design

Woodland Plants

Location plan

Woodland Perspective

Plants Detail Design

Phyto-remediation Plants

Location plan

Perspective

Phyto-remediation

Wetland Plants Plants Detail Design

Location plan

Physical Model

Playscape Perspective

Workshop Perspective

Location plan

Accessbility

Activities for multiple users and abilities, social groups.

User Age Group

Use of material to show Civic Pride

Daytime activities

Site Activation

Nighttime activities

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.