PROTECT | RESTORE | ENRICH - BRINGING BIODIVERSITY BACK TO WHITE BAY

Page 1


WHITE BAY WATERFRONT, SYDNEY

REGENERATING SYDNEY’S WATERFRONT BIODIVERSITY

REGENERATE - HYBRID QUESTION

How can White Bay become a working urban waterfront, which protects and restores, resilient & sustainable landscape systems, while enriching people’s connection to the waterfront ?

1 2 3 WORKING WATERFRONT BIODIVERSITY & LANDSCAPE SYSTEMS PEOPLES CONNECTION TO WATERFRONT

SYDNEY KEY PLAN 1

KEY FOCUS SITE 2 N

WHITE BAY CRUISE TERMINAL

REGENERATE - PROJECT TIME LINE [KEY PHASES]

1 REMEDIATION OF LAND & LANDSCAPE SYSTEM TO REMOVE POST-INDUSTRIAL CONTAMINATION

DESIGN METHOD - PHYTOREMEDIATION

ABIDING EVENT - BEGINNING OF WHITE BAY METRO STATION & DEVELOPMENT

2 ESTABLISHMENT OF RESILIENT HYDROLOGY SYSTEM (BIOFILTRATION) TO CONTINUE FILTERING POLLUTANTS & CREATE HABITAT

DESIGN METHOD - URBAN BIOFILTRATION + WSUD

ABIDING EVENT - SOIL TOXICITY REDUCED BY 60%

3 FORMATION OF A THRIVING INTER-TIDAL WATERFRONT, THAT PROVIDES HABITAT FOR BOTH NON-HUMAN AND HUMAN SPECIES WITHIN AN WORKING URBAN HARBOUR

DESIGN METHOD - INTER-TIDAL WATERFRONT DESIGN

ABIDING EVENT - HEALTHY SUPPORTING HYDROLOGY SYSTEM

4 FACILITATE URBAN DEVELOPMENT PROGRAM WITHIN THE LANDSCAPE SYSTEM TO FUND THE PROJECT

DESIGN METHOD - URBAN DESIGN + WSUD

ABIDING EVENT - COMPLETION OF HYDROLOGY SYSTEM

REGENERATE - FUNDAMENTAL SITE ASSETS

HYDROLOGY SYSTEM

EXISTING HYDROLOGY SYSTEM

REMEDIATING HYDROLOGY SYSTEM WORKING HYDROLOGY SYSTEM

LIMITED LANDSCAPE FUNCTION EXISTING

CATCHMENT AREA = 116 HECTARES

YEARLY VOLUME OF WATER FLOWING THROUGH CONTAMINATED LAND = 372048 KL

REMEDIATING LANDSCAPE

INTERMEDIATE GOAL

FUNCTIONING LANDSCAPE SYSTEM

FUTURE GOAL

HYDROLOGY SYSTEM & EDGES

LEACHES THROUGH SANDSTONE

POLLUTED GROUNDWATER RELEASED TO WHITE BAY, POLLUTING HARBOUR AND MARINE LIFE

GROUNDWATER CONTAMINATED WITH SOIL TOXINS

RAIN AND SURFACE RUNOFF COLLECTS SURFACE POLLUTANTS

INDUSTRIAL CONTAMINATION IN SOIL

RAIN AND SURFACE RUNOFF INFILTRATES TO CONTAMINATED SOIL

EXISTING SITE SECTION - 1:1000

URBAN RUNOFF
BALMAIN
WHITE BAY WATERFRONT WHITE BAY - SYDNEY HARBOUR
ROBERT STREET
BIRRUNG PARK SANDSTONE CLIFF
WATER EDGE
CLIFF EDGE

REGENERATE - FUNDAMENTAL SITE ASSETS

WATERS EDGE & TIDAL CHANGES

EXISTING WATERS EDGE WEEKLY TIDAL MOVEMENTS 1 TERM 2 STUDIO WORK

REGENERATE - FUNDAMENTAL SITE ASSETS

WATERS EDGE & SEA LEVEL RISE

CURRENT SEA WALL PROTECT SHORE FROM ALL TIDES

WATERTABLE BELOW CONTAMINATED SOIL

SEA WALL UNDER PRESSURE FROM HIGHER TIDES, OFFERING LIMITED SHORE PROTECTION

HIGHER TIDES SEEP THROUGH GROUND UNDERMINING SOIL & BECOMING CONTAMINATED WITH GROUND POLLUTION AS WATERTABLE RISES

SEA LEVEL HIGHER THAN WALL AND BREAKS SHORE LINE AT HIGH TIDE INUNDATING CONCRETE PLATFORM AT EACH HIGH TIDE

SHORE PROTECTION HAS LITTLE TO NO EFFECT

AS SEA LEVEL RISES, THE WATER TABLE RISES WITH IT, CAUSING UP TO 70% INCREASE IN SURFACE RUNOFF (Nuttle, WK & Portnoy, JW 1992)

GROUND WATER IS CONTAMIATED WITH TOXIC SOIL

EXISTING CONTAMINATED SITE - 2021

CATCHMENT --> CONTAMINATION --> HARBOUR

CATCHMENT --> REMEDIATING LANDSCAPE --> HARBOUR

CATCHMENT --> REMEDIATION --> INTER-TIDAL EDGE --> HARBOUR

CATCHMENT --> FILTRATION --> INTER-TIDAL EDGE --> HARBOUR

WATERFRONT PHYTO-REMEDIATION 3 4 CRUISE TERMINAL PRECINCT PHYTO-REMEDIATION MEADOWS ALONG KEY FUTURE DRAINAGE PATHS

1 CAPPED CONTAMINATES ZONE 2 WATERFRONT WALKWAY

3 INTER-TIDAL POOLS CUT INTO CONCRETE

4 FLOATING SHORE PROTECTION BARRIERS

5 CRUISE TERMINAL PRECINCT

6 PHYTO-REMEDIATION MEADOWS ALONG KEY FUTURE DRAINAGE PATHS

REGENERATE - KEY MOVES

KEY MOVE 1

PHYTO-REMEDIATION

KEY MOVE 2 URBAN BIO-FILTRATION

KEY MOVE 3: URBAN INTER-TIDAL WATERFRONT

REGENERATE - KEY MOVES

KEY MOVE 2: URBAN FILTRATION

KEY MOVE 1 PHYTO-REMEDIATION

KEY MOVE 2 BIO-FILTRATION

RESIDENTIAL STREET NATIVE RESERVE SWALES & ROCK CUT

KEY MOVE 3: URBAN INTER-TIDAL WATERFRONT

BAY SEAWALL FIELD OPERATIONS

STREETS, BUILDINGS & WSUD ELEMENTS WATERFRONT STREET

PLANTING, WSUD INTER-TIDAL ECOLOGY, BIOFILTRATION, PATHWAYS, SEA RISE PROTECTION

URBAN ZONE ROCK EDGE BIRRUNG PARK DONNELLY STREET

ROBERT STREET

ZONE

ZONE

ELLIOTT BAY SEAWALL FIELD OPERATIONS
ELLIOTT BAY SEAWALL FIELD OPERATIONS
HUDSON RIVER GREENWAY
ELLIOTT

REGENERATE - KEY MOVES

STORMWATER COLLECTED INTO PARKLAND AND SLOWLY RELEASED THROUGH SANDSTONE 2

URBAN BI-FILTRATION THROUGH WSUD STREETS FILTERS STORMWATER COLLECTING CONTAMINANTS POLLUTION AND SLOWING WATER SPEED

DURING DRY PERIODS WATER CAN BE STORED IN THE URBAN SYSTEM FOR IRRIGATION ETC

SWALES THROUGH STREETS COLLECT & FILTER RUNOFF

SOFT LANDSCAPES OF RAIN-GARDENS SLOW AND STORE WATER IN URBAN AREAS - WATER STORED OVER DRYER PERIODS

NATURAL VEGETATION COLLECTS WATER SLOWLY RELEASES IT TO HARBOR 4

URBAN STORM-WATER COLLECTED ON STREETS RUNOFF FLOW SYSTEM - 1:

ECOLOGICAL ZONE COLLECTS, FILTERS AND SLOWS WATER FLOW BEFORE ENTERING THE HARBOUR

INTER-TIDAL ZONE FILTRATION

INTER-TIDAL SPECIES & TIDAL POOLS OPERATE AS FINAL STAGE OF FILTRATION 4

REGENERATE - KEY MOVE 1 - PHYTO-REMEDIATION

1 REMEDIATION OF LAND & LANDSCAPE SYSTEM TO REMOVE POST-INDUSTRIAL CONTAMINATION

DESIGN METHOD - PHYTOREMEDIATION

ABIDING EVENT - BEGINNING OF WHITE BAY METRO STATION & DEVELOPMENT

2 ESTABLISHMENT OF RESILIENT HYDROLOGY SYSTEM (BIOFILTRATION) TO CONTINUE FILTERING POLLUTANTS & CREATE HABITAT

DESIGN METHOD - URBAN BIOFILTRATION + WSUD

ABIDING EVENT - SOIL TOXICITY REDUCED BY 60%

3 FACILITATE URBAN DEVELOPMENT PROGRAM WITHIN THE LANDSCAPE SYSTEM TO FUND THE PROJECT

DESIGN METHOD - URBAN DESIGN + WSUD

ABIDING EVENT - COMPLETION OF HYDROLOGY SYSTEM

4 FORMATION OF A THRIVING INTER-TIDAL WATERFRONT, THAT PROVIDES HABITAT FOR BOTH NON-HUMAN AND HUMAN SPECIES WITHIN AN WORKING URBAN HARBOUR

DESIGN METHOD - INTER-TIDAL WATERFRONT DESIGN

ABIDING EVENT - HEALTHY SUPPORTING HYDROLOGY SYSTEM

REGENERATE - KEY MOVE 1 - PHYTO-REMEDIATION

EXISTING SITE - HIGHLY CONTAMINATED SOIL

PHASE 1 - PHYTO-REMEDIATION

- REMEDIATION MEADOWS ALONG KEY DRAINAGE PATHS & WATERFRONT EDGE

- SAFE TO FAIL TESTING OF PHYTO PLANT SPECIES AND MEADOW MIXES

PHASE 2 - PHYTO-REMEDIATION

- REMEDIATED DRAINAGE PATHS ALLOW FOR WATER TO FLOW THROUGH THESE CORRIDORS AND RELEASE TO WHITE BAY WITHOUT BECOMING CONTAMINATED WITH TOXIC SOIL POLLUTANTS

- PHYTO-REMEDIATION MEADOWS EXTENDED TO INFILL SPACES BETWEEN DRAINAGE PATHS WHERE NATURAL LAND WILL BE UTILISED

- COMPOSTED MATERIAL FROM STAGE 1 USED TO FORM SOIL FOR PHASE 2

PHYTOREMEDIATION MEADOWS PHASE 1

PHYTOREMEDIATION MEADOWS PHASE 2

REGENERATE - KEY MOVE 1 - PHYTO-REMEDIATION

COMPOSTED MATERIALS ADDED TO SOIL WHERE CONCRETE IS REMOVED

PLANTS PLANTED FOR PHYTOREMEDIATION

PLANTS ABSORB & TREAT CONTAMINANTS

SITE BASED COMPOST USING FUNGI, MICROBES & CHEMICAL ADDITIVES USED TO BREAKDOWN CONTAINMENTS IN PLANT MATERIALS

END OF PLANTS LIFE CYCLE, PLANT REMOVED & COMPOSTED

Contaminates

Source: Phytoremediation Principles — POWER PLANTS PHYTOREMEDIATION,

Juncus usitatus
Common
Casurina trees

REGENERATE - KEY MOVE 1 - PHYTO-REMEDIATION

REGENERATE - KEY MOVE 1 - PHYTO-REMEDIATION

RE-GENERATED LANDSCAPE - 2030 - HUMAN INTERACTION

REGENERATE - KEY MOVE 2 - URBAN FILTRATION

1 REMEDIATION OF LAND & LANDSCAPE SYSTEM TO REMOVE POST-INDUSTRIAL CONTAMINATION

DESIGN METHOD - PHYTOREMEDIATION

ABIDING EVENT - BEGINNING OF WHITE BAY METRO STATION & DEVELOPMENT

2 ESTABLISHMENT OF RESILIENT HYDROLOGY SYSTEM (BIOFILTRATION) TO CONTINUE FILTERING POLLUTANTS & CREATE HABITAT

DESIGN METHOD - URBAN BIOFILTRATION + WSUD

ABIDING EVENT - SOIL TOXICITY REDUCED BY 60%

3 FACILITATE URBAN DEVELOPMENT PROGRAM WITHIN THE LANDSCAPE SYSTEM TO FUND THE PROJECT

DESIGN METHOD - URBAN DESIGN + WSUD

ABIDING EVENT - COMPLETION OF HYDROLOGY SYSTEM

4 FORMATION OF A THRIVING INTER-TIDAL WATERFRONT, THAT PROVIDES HABITAT FOR BOTH NON-HUMAN AND HUMAN SPECIES WITHIN AN WORKING URBAN HARBOUR

DESIGN METHOD - INTER-TIDAL WATERFRONT DESIGN

ABIDING EVENT - HEALTHY SUPPORTING HYDROLOGY SYSTEM

REGENERATE - KEY MOVE 2 - URBAN FILTRATION

URBAN STORM-WATER COLLECTED ON STREETS

STORMWATER COLLECTED INTO PARKLAND AND SLOWLY RELEASED THROUGH SANDSTONE 2

URBAN BI-FILTRATION THROUGH WSUD STREETS FILTERS STORMWATER COLLECTING CONTAMINANTS POLLUTION AND SLOWING WATER SPEED

DURING DRY PERIODS WATER CAN BE STORED IN THE URBAN SYSTEM FOR IRRIGATION ETC 3

NATURAL VEGETATION COLLECTS WATER SLOWLY RELEASES IT TO HARBOR 4

INTER-TIDAL ZONE FILTRATION

INTER-TIDAL SPECIES & TIDAL POOLS OPERATE AS FINAL STAGE OF FILTRATION 4

REGENERATE - KEY MOVE 2 - URBAN FILTRATION

BUILDING STORMWATER RELEASED TO STREET WSUD SYSTEM TO BE FILTERED & USED TO IRRIGATE SOFT LANDSCAPE

BIRRUNG PARK FORMS AN EXISTING EDGE WHERE WATER IS SLOWED FILTERED AND SLOWLY RELEASED THROUGH SANDSTONE INTO THE WHITE BAY PRECINCT

SWALES COLLECT RUNOFF ALONG STREET EDGES

FLOW THROUGH URBAN STREETS

URBAN RUNOFF DIRECTION

BIOFILTRATION SYSTEMS

STREETS ARE PURPOSED TO COLLECT, FILTER AND SLOW WATER FLOW AS WELL AS FACILITATE MOVEMENT

5 MULTI-USE BUILDINGS PROVIDE INCOME TO SUPPORT THE PROJECT AND CREATE PROGRAMS SUCH AS CAFES, RETAIL AND OFFICES FOR PEOPLE TO USE THE WATERFRONT SITE

KEY RUNOFF PATH

KEY PEDESTRIAN WALKWAY AND POINTS OF INTEREST

REGENERATE - KEY MOVE 2 - URBAN FILTRATION

BUILDINGS STORMWATER RELEASED TO STREET BIO-FILTRATION SYSTEM

2 LANE STREET FOOTPATH RAIN-GARDEN & SWALE

RAIN-GARDEN & SWALE FOOTPATH MULTI-USE BUILDING

STREET SECTION -WSUD STREETS - 1100 @ A3

RUNOFF RUNOFF COLLECTION & FILTRATION BUILDING STORMATER

CARREX APPRESSA JUNCUS USITATUS LOMMANDRA LONGIFOLIA DIANELLA CAERULEA CALLISTEMON ELAEOCARPUS RETICULATUS

REGENERATE - KEY MOVE 2 - URBAN FILTRATION

REGENERATE - KEY MOVE 3 - INTER-TIDAL EDGE

1 REMEDIATION OF LAND & LANDSCAPE SYSTEM TO REMOVE POST-INDUSTRIAL CONTAMINATION

DESIGN METHOD - PHYTOREMEDIATION

ABIDING EVENT - BEGINNING OF WHITE BAY METRO STATION & DEVELOPMENT

2 ESTABLISHMENT OF RESILIENT HYDROLOGY SYSTEM (BIOFILTRATION) TO CONTINUE FILTERING POLLUTANTS & CREATE HABITAT

DESIGN METHOD - URBAN BIOFILTRATION + WSUD

ABIDING EVENT - SOIL TOXICITY REDUCED BY 60%

3 FACILITATE URBAN DEVELOPMENT PROGRAM WITHIN THE LANDSCAPE SYSTEM TO FUND THE PROJECT

DESIGN METHOD - URBAN DESIGN + WSUD

ABIDING EVENT - COMPLETION OF HYDROLOGY SYSTEM

4 FORMATION OF A THRIVING INTER-TIDAL WATERFRONT, THAT PROVIDES HABITAT FOR BOTH NON-HUMAN AND HUMAN SPECIES WITHIN AN WORKING URBAN HARBOUR

DESIGN METHOD - INTER-TIDAL WATERFRONT DESIGN

ABIDING EVENT - HEALTHY SUPPORTING HYDROLOGY SYSTEM

REGENERATE - KEY MOVE 3 - INTER-TIDAL EDGE

URBAN STORM-WATER COLLECTED ON STREETS

STORMWATER COLLECTED INTO PARKLAND AND SLOWLY RELEASED THROUGH SANDSTONE 2

URBAN BI-FILTRATION THROUGH WSUD STREETS FILTERS STORMWATER COLLECTING CONTAMINANTS POLLUTION AND SLOWING WATER SPEED

DURING DRY PERIODS WATER CAN BE STORED IN THE URBAN SYSTEM FOR IRRIGATION ETC 3

NATURAL VEGETATION COLLECTS WATER SLOWLY RELEASES IT TO HARBOR 4

INTER-TIDAL ZONE FILTRATION

INTER-TIDAL SPECIES & TIDAL POOLS OPERATE AS FINAL STAGE OF FILTRATION 4

REGENERATE - KEY MOVE 3 - INTER-TIDAL EDGE

REGENERATE - KEY MOVE 3 - INTER-TIDAL EDGE

EXISTING WATERFRONT EDGE

CONCRETE EDGE

CURRENT TIDE LEVELS

APPROX 1M TO 1.5M DIFFERENCE IN DAILY TIDES CUT WATERFRONT EDGE

PHYTO-REMEDIATION

CURRENT TIDE LEVELS SEA LEVEL RISE BY 2030 APPROX 0.2M

EMERGING INTER-TIDAL EDGE

PLANTING TO ABSORB SPLASH ZONE WATER ROCK POOLS AND TIDAL ZONES FILL AND EMPTY WITH DAILY TIDES SEPARATED WALKWAY FRO

EMERGENCE OF TIDAL ZONES

EDGE TYPE 1 - ATTACHED TO SHORELINE

PLANTED AREA WITH WSUD ELEMENTS FILTERING RUNOFF

VIEWING PLATFORM & WALKWAY

GROUND WATER SEEPS THROUGH SOIL TO TIDAL EDGE

SURFACE WATER DEPOSITED TO TIDAL EDGE THROUGH PERFORATED PLATFORM

EDGE TYPE 2 - SEPARATE FROM SHORELINE

PLANTING TO ABSORB SPLASH ZONE WATER

ROCK POOLS AND TIDAL ZONES FILL AND EMPTY WITH DAILY TIDES

SEPARATED WALKWAY FRO PEOPLE TO VIEW EDGE PIERS PROVIDE WAVE DISSIPATION FROM BOATS AND HABITAT

CUT EDGE WITH ARTIFICIAL SHORE PROTECTION BLOCKS

TEXTURED DESIGN TO CREATE HABITAT OPPORTUNITY

LONG TERM WATER FILTRATION ENCOURAGES NEW LIFE SUCH AS SEA GRASS TO GROW IN MID DEPTH WATER ON TIDAL EDGE

TIDAL EDGE AS SEA LEVEL REACH 800MM INCREASE

DEEP

WALKWAY WITH TIDAL ZONE UNDER

ELEVATED WALKWAY

REGENERATE - KEY MOVE 3 - INTER-TIDAL EDGE

INSECT HABITAT IN TERRESTRIAL ZONE IN PLANTINGS

FISH HABITAT AMONGST

UNDER WALKWAY TIDAL LANDSCAPE 1

REGENERATE - WORKING HARBOUR

WHITE BAY CRUISE SHIP TERMINAL FOR INTERNATIONAL CRUISE ARRIVALS & DEPARTURES

WAVES FROM BOAT TURBULENCE AND TIDAL MOVEMENTS

WHITE BAY CONTAINER TERMINAL ON GLEBE ISLAND CURRENTLY IN USE FOR SHIPPING AND PORT

FUTURE USE POTENTIALLY FERRIES AND COMMERCIAL SHIPS

REGENERATE - KEY MOVE 3 - INTER-TIDAL EDGE

TOP OF FLOATING STRUCTURES PLANTED WITH GRASSES AND SHRUBS TO CREATE PROTECTED HABITAT FOR BIRDS AND INSECTS, SEPARATED FROM HUMAN INTERACTION

FLOATING STRUCTURES CONSTRUCTED OF MULTIPLE LAYERS INCLUDING:

CONCRETE STABILISATION FOR INTER-TIDAL ZONE

CHAIN TETHER FIXED TO CONCRETE STABILIZER

CHAIN CREATE CATALYST FOR MARINE LIFE SUCH AS OYSTERS AND LIMPETS

PROVIDING AN ATTACHMENT POINT

TOP LAYER - SOIL MIDDLE LAYER - AGGREGATE BASE LAYER - BUOYANT BASE STRUCTURE (PONTOON)

OYSTER COMMUNITY FORMS CREATING A NATURAL BARRIER OF OYSTER SHELLS ABSORBING WAVE ENERGY

RAMPED EDGE WITH ROCKERY ABSORBS WAVE ENERGY FROM BOATS & STORM SURGES

PROVIDES INTER-TIDAL HABITAT FOR CRABS AND OYSTERS

PONTOON AND FLOATS ALLOW STRUCTURE TO FLOAT ON TO OF SURFACE ACCORDING TO TIDAL CHANGES

UNDERSIDE OF STRUCTURE PROVIDES HABITAT FOR FISH AND FILTER FEEDERS

FLOATING STRUCTURE EXTENDS BELOW SURFACE LEVEL TO REDUCE UNDER CURRENT FORCE OF WAVES

STRUCTURE TETHERED WITH CHAINS TO ALLOW FOR MOVEMENT WITH TIDAL PATTENS

REGENERATE - MODEL TESTING

AVERAGE HIGH TIDE 2100

2.6M HIGH

AVERAGE LOW TIDE 2100

1.6M HIGH

MODEL TESTING OF FLOATING ISLAND

SEPARATED WALKWAY

INTER-TIDAL ZONE

PLANTED FORESHORE - ABSORBS & BLOKES TIDAL SURGES

SMOOTH WATER BEHIND ISLAND

PLANTED ZONE OF FLOATING STRUCTURE

ROCKERY TO ABSORB WAVE SURGES

ROUGH WATER CAUSED BY WAVE ACTION

WEEDS REACH CONTAMINATED SOIL LAYERPHYTO-REMEDIATION TO BEGIN TO REMOVE THESE CONTAMINATES

WEEDY GRASSES GROWING IN CRACK BETWEEN CONCRETE

CONCRETE PLATFORM

CONTAMINATED SOIL UNDER CONCRETE PLATFORM

PHYTOREMEDIATION TO BE IMPLEMENTED TO RESOLVE THIS ISSUE

EXISTING WATER TABLE
WATER TABLE

INTER-TIDAL EDGE PHASES

REMAINING CONCRETE APRON STRUCTURE CUT TO ALLOW FOR ROOTS TO PENETRATE DEEPER SOIL

PHYTO PLANTING STABILIZES SOIL CONTAMINTS

EXISTING WATER TABLE

CONTAMINATED SOIL PUSHED TO SURFACE WITH RISING WATER-TABLE

WATER TABLE RISERS AS SEA LEVEL RISES

PUSHES CONTAMINANTS CLOSER TO SURFACE

GRASS & SHRUB PLANTING ALONG WATERS EDGE

FILLED ROCKS & BOULDERS IN CUT AREA TO CREATE TIDAL ROCK POOLS

CONCRETE STRUCTURE LEFT OVER FROM CUT INTO SHORE REMAIN TO STABLISE NEW INTER-TIDAL ZONE

AGGREGATE BED FILL TO BASE OF CUT CONCRETE ZONE TO FORM ROCK TEXTURED SURFACE FOR INTER-TIDAL LIFE

FLAT BED FOR SEA GRASS GROWTH IN THE MARINE ZONE

TIDAL ROCK POOLS FOR OYSTERS, CRABS, LIMPETS & OTHER INTER-TIDAL SPECIES

GRASSES & SHRUBS CREATE HABITAT FOR INSECTS LIKE NATIVE BEES AS WELL AS A FINAL LAYER OF FILTRATION BEFORE WATER ENTERS THE INTER-TIDAL ZONE AVERAGE HIGH TIDE 2100

PERFORATED FRP WALKWAY FOR HUMAN ACCESS & TO ALLOW SUNLIGHT THROUGH TO SEAGRASS BED

SEAGRASS BED & FISH HABITAT

CONCRETE ANCHOR FOOTING FOR WAVE DEFENSE & TO STABILISE INTER-TIDAL ZONE

LOW TIDE 2100

SPLASH ZONE INSECT AND PLANT HABITAT 20M WIDE

HIGH TIDE ZONE - ROCK FILL - OYSTER AND CRAB HABITAT

LOW TIDE ZONE - ROCK FILL FISH AND OYSTER HABITAT 10M WIDE

MARINE ZONE - AGGREGATE AND SAND FILL WITH ELEVATED WALKWAY ABOVE HUMAN, SEAGRASS & FISH HABITAT

WIDE

MARINE DEFENSE BLOCK TEXTURED CONCRETE 10M WIDE

REGENERATE - INTER-TIDAL EDGE SPECIES

OYSTER COLONIES BIND TOGETHER TO FORM A BED OF OYSTER SHELLS CREATING A NATURAL BIO-DIVERSE SEA BARRIER AND FILTRATION LAYER

LIMPETS

SYDNEY ROCK OYSTERS

SYDNEY RED BAIT CRAB

SYDNEY FISH SPECIES: - BREAM - BOXFISH - EASTERN STIPEY - GOATFISH - SNAPPER

POLLUTED WATER SUCKED IN BY OYSTER

OYSTER FEEDS ON POLLUTANTS IN WATER & REMOVES THEM FROM WATER

FILTERED WATER RELEASED INTO HARBOUR

REGENERATE - HUMAN EXPERIENCE IN THE LANDSCAPE