REgenerating The Bays Precinct

Page 1


REGENERATING THE BAYS PRECINCT

How can we use time as a design opportunity in order to improve active transportation around the Bays precinct ?

Project 3
Joshua Di Giannantonio Z5160478

Past

Glebe Island Bridge

How can we link the history of the site to active transport in order to represent how time has passed through the bays precinct ?

Can the Past inform the Present ? How can we learn from the sites Transportation history ?

1855, THE OPENING OF THE SYDNEY GOODSLINE

Present

Transport Today

What can we do now ? How can the current conditions of the site inform or influence future change around the Bays Precinct ?

1855, THE OPENING OF THE SYDNEY GOODSLINE

Future

Elevated Bike Path Network

How can we REgenerate these existing historical markers at the Bays precinct. How do these existing historical markers change over the next 50,100, 200,500 years ?

1855, THE OPENING OF THE SYDNEY GOODSLINE

FUNDAMENTAL ASSEST

Connections to surrounding open space

Unlock permeability at precinct edges via access nodes aligned to existing connections, greater permeability along the boundary to Balmain/Rozelle and connections to surrounding open spaces including callan Park

Historical Markers

How can we REnew these existing historical markers at the Bays precinct specifically looking at Glebe Island bridge and WhiteBay Power Station. How do these existing historical markers change over the next 50,100, 200,500 years ? How do these influence active transport around the site ?

Infrustructure and Topography

The road infrastructure has evolved beginning with the widening of Victoria Road in the 1930s. The changing ways the land has been used has cut the precinct off from its surroundings. Major transport routes today are a product of the topography, the Harbour and the settlement pattern. The White Bay Power Station is at nexus of these routes. These have resulted in strategic benefits but also natural environmental impacts.

PREVIOUS ACTIVE TRANSPORT COMMENTS:

(Inner west residents)

What

can we do NOW ?

- “ Some cycling routes are in poor condition and are opportunities to improve accessibility.”

- “ Cycling infrastructure also needs to be provided.”

- “Cycleways that are not lit can be dangerous at night.”

Community Stakeholder Consultation Timeline

REgenerating The Bays Precinct

VISION

REgenerating the Bays

The Bays Precinct will become a world-class active transport community. Everyone in the Bays Precinct will be able to travel by bicycle on a comfortable, safe and connected bicycle network. Bicycling will become a viable transportation option and will elevate the quality of life for people traveling to and from the Bays Precinct.

THE BAYS PRECINCT

GUIDING PRINCIPLES

Relaxing and taking in the expansive view of the harbour as well as surrounding green spaces.

Wide pathways and designated bike path over Glebe island bridge

Understand the prior use of the Glebe Island Bridge and its role in transportation.

Visitors enjoy a community event that will be held on Glebe Island as well as use of active transport networks.

Cycle routes connecting the precinct for everyone to use

Existing active transport and wide generous pathways to link with Glebe Island.

Wide pathways and modern seating in the historic Glebe Island.

White Bay Power Station.

phytoremediation to be conducted outside of White Bay Power station with the main objective to clean contaminated soils over time

SITE ANALYSIS

What if we could Improve the precinct’s connectivity and integration into its locality and surrounding areas ?

Regional Active Transport network

Off road shared path network

Harbour Foreshore walk

Foreshore shared path network

Access for active transport

What if we were able to access more of the site ?

Anzac Bridge pedestrian ramp in Pyrmont
Off road shared path in Bicentenial Park
Anzac Bridge shared path
Steep Topography changes on Glebe Island
Sandstone cutting under Anzac bridge towards Glebe Island Bridge
Lilyfield light rail station
BEFRIEND: Images were sourced from Isabel Peng, Georgie Purkiss and Harry Dunn helping me locate access points around the site
BEFRIEND: Images were sourced from Isabel Peng, Georgie Purkiss and Harry Dunn helping me locate access points around the site

SITE ANALYSIS

How can we combat the impacts of sea level rise ? How does active transportation look at the Bays ?

Sea level rise scenario to observe how the 2100 high tide inundation changes

2100 I + 0.74m Highest Tide

Maximise Active Transport Links

KEY MOVES

1. IMPROVE PRECINCT CONNECTIVITY

2. RETAINING EXISTING BUSINESSES AT ROZELLE BAY AND BAYS WATERWAYS

3. PROVIDE NEW AND IMPROVED ACTIVE GREEN SPACES

4. PROVIDE A SEPERATE ELEVATED CYCLEWAY CONNECTING THE BAYS PRECINCT

5. IMPROVE ACTIVE TRANSPORT ACCESS AROUND THE SITE

6. RESTORE GLEBE ISLAND BRIDGE FOR ACTIVE TRANSPORT USE

MASTER PLAN

REGENERATE

PRECINCT MATERIALS

ELEVATED PATH

ELEVATED PATH

PRECINCT BLOCK TYPES

Natural Form Complex Terraced Apartment

GFA: 270,300m2

Type 1: 90,600m2

Type 2: 45,300m2

No of Dwellings:

Type 1: 1812

Type 2: 906

Population No:

Type 1: 5436

Type 2: 2718

GFA: 241,450m2

Type 1: 22,300m2

Type 2: 21,150m2

No of Dwellings:

Type 1: 2203

Type 2: 210

Population No:

Type 1: 6,609

Type 2: 630

Residential House Residential + Commercial

GFA: 17,100m2

Type 1: 17,100m2

No of Dwellings:

Type 1: 144

Population No:

Type 1: 1035

GFA: 23,600m2

Type 1: 19,600m2

Type 2: 4000m2

No of Dwellings:

Type 1: 50

Type 2: 8

BIRD HABITAT

ORBACLES

How can we further Biodiversity at the Bays Precinct ?

ORBACLE A / BIRD HOUSE PRESENT (2021) BIRD POPULATION

HOUSE - SOUND

The bird houses are filled with nesting materials, and activated with bird sounds, coming from speakers hidden in the modules,powered by solar panels. ORBACLE B / BIRD FOOD

FOOD - SCENT

The

BATH - WATER

BIRD HABITAT

Can we protect local bird species from climate change over the next 100 years through the implamentation of these bird habitats ?

https://2017.northernspark.org/projects/orbacles-2017-creative-city-challenge-winner/index.html

Galah White-browed
Superb Fairy-wren Tree Martin

BIRD HABITAT

LIGHTING

Lighting is to be upgraded throughout the Bays precinct to provide improved safety as well as to highlight and celebrate significant features in the precinct. It is recommended that new column lighting be provided around the precinct. This custom column light could be designed using the distinctive red colour of the existing poles.

The adoption of improved LED light fittings will enhance safety and reduce light spill and energy consumption. These would be located on key pedestrian through site links, including the diagonal path linking Denison Street and Lilyfield Road access point to Glebe point road access point.

LIGHTING

TYPE 1: Primary Path

Accent and up lighting

2: Primary Path Colum lighting

3:

lighting Heritage items

TYPE
TYPE

ACTIVE SPACES

SHOPFRONTS

PHYTOREMEDIATION

Can we commence Phytoremediation in 2023 ?

PRECINCT PLANTING PHYTOREMEDIATION

REMEDIATION PLANTS

Existing plants species (present industrial context)

Future plants species

Native vegetation

Cogon Grass Poinsettia Bracken Fern Black Wattle
Mulberry Tree Lantana Tussock Grass
Pittosporum Sugar Gum Breynia Grass
Removes Manganese Removes Zinc,Lead, Molybdenum, Mercury Removes Cadmium.Lead, Nickel,Zinc
Removes Cadmium,Carbon, Chromium,Copper,Nickel, Zinc
Removes Carcinogenic PAH’s, Benzo (a) Pyene Removes Zinc,Copper,Carbon, Magnesium Removes Nickel & Zinc
Removes Carcinogenic PAH’s Removes Lead, Nickel Removes Cadmium.Lead, Nickel,Zinc,Copper

PRECINCT SPACES

DETAILED PLAN 1

Section

PRECINCT SPACES

DETAILED PLAN 2

Scale: 1:2000 @A3 Scale: 1:150 @A3

PRECINCT SPACES

DETAILED PLAN 3

Scale: 1:2000 @A3
Scale: 1:150 @A3
Section CC

PRECINCT SPACES

TRANSECT 1

Sandstone Gymea
Hawksbury
Disturbed Soil

PRECINCT SPACES

TRANSECT 2

PRECINCT SPACES

MODEL

ACTIVE STREET INFLUENCES

PROVIDE SAFE CONNECTIONS FOR ACTIVE TRANSPORT USERS

PROVIDE STREET SINAGE FOR ACTIVE TRANSPORT USERS

Can we design and plan in accordance with the NSW State Government future transport strategy ?

PROVIDE DESIGNATED BIKE LANES

STAGING PLAN

Bike Track

Two Lane Road

Single Lane Road Pedestrian Area

Phytoremediators Existing Builf Form

Density

STAGING PLAN

What happens in the Long-TERM ?

STAGE 2 MID-TERM 2021 - 2030

Actions:

- Review existing cycleway/wayfinding signage.

- Implementation of crossings where there are existing shared paths

- Phytoremediation to commence

STAGE 1 NOW 2021

Actions:

- Community consultation/ Stakeholder consultation outcomes

- Removal of gates, barriers, the site if only fully accessbale on Saturday and Sunday

STAGE 3 LONG-TERM 2060? 2090?

Actions:

- The introduction of an elevated path system that caters for all modes of active transport.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.