Walking Towards

Page 1


Walking Towards

Investigating the potential of active transportation in a post-industral site

Brief & Context

Fundamental Assets Design Develepment by TIME

Hybrid & Theme

Site Value in DEEPTIME

Hybrid & Theme | Landscape Academic Topic

“By being sweet to the pedestrian and the cyclist you hit five birds with one stone – you get a lively city, you get an attractive city, you get a safe city, you get a sustainable city, and you get a city that’s good for your health. ” - Jan Gehl

Hybrid & Theme | From Walking

& Cycling to REgenerate

“By being sweet to the pedestrian and the cyclist you hit five birds with one stone – you get a lively city , you get an attractive city, you get a safe city, you get a sustainable city, and you get a city that’s good for your health.” - Jan Gehl

Hybrid & Theme | From Walking & Cycling to Future Urban Challenge

Urban Heat Island

Biodiversity

BY Chufeng HUANG

Hybrid & Theme | The Hybrid Question

What if walking & cycling between Pyrmont and Balmain introduce ecological recovery to the post-industrial site and ready for high density urban development

Fundamental Assets| Context of Sydney

Sydney CBD
Balmian Centre
Prymont Centre (Under Planning)
Sydney CBD

Fundamental Assets| Context of Neigbourhood

The Bays Neigbourhood

Pyrmont
Life style in Prymont
Life style in Balmian
Pyrmont Public Life
Balmian Public

Fundamental Assets| Context of Sydney

Active Transporation -Walking & Cycling (Destination)

Fundamental Assets| Context of Sydney

Active Transporation - Walking & Cycling (Recreation)

Balmian Centre
Prymont Centre (Under Planning)
Sydney CBD
Redevelope Pyrmont water front -Pirrama Park Playground
Redevelope Balmain water front - The Fenwick

Hybrid & Theme | The Site Selection

Fundamental Assets

Site Value in DEEPTIME

Fundamental Assets | Harbour Culture

Harbour view
City Sunraise to east at morning
Harbour View at Birrung Park

Fundamental Assets | Working Harbour

View to Silo
Exsiting Glebe Island Bridge (Old photo) Working Port
DeepwaterPort Shipping Route View point

Fundamental Assets | Exsiting and Planned Connections

Birrung Park
Donelly Street
Glebe Island Bridge
Example of developed waterfront walk

Fundamental Assets | Exsiting and Planned HABITAT Connections

Forest Habitat
Open Space / Street Tree
New Built Habitat Habitat Link
Tristaniopsis laurina (Water Gum) Banksia interifolia (Coast Banksia)
Lepidosperna laterale at Glebe Island Bridge phytoremediation at WBPS

Fundamental Assets | Exsiting and Planned HABITAT Connections

Forest Habitat
Open Space / Street Tree
New Built Habitat
Long-nosed Bandicoot
Brush-tailed possum
Habitat Link

Fundamental Assets ? | Toxic soil and drainage

Balmian White Bay
The Site Gelebe
* Soil Imformation by Yu Fu

Design Develepment by TIME

Understand the complexity of DEEPTIME

Towad by TIME | Neigbourhood Development

Towad by TIME | Now. Industrial Led / Transportation Led

• Functioning Working Harbour ONLY • Close to public

The Bays Waterfront
Balmian White Bay Glebe Island Pyrmont

Towad by TIME | Stage 0. Development Led

The Bays Waterfront

Balmian White Bay Glebe Island Pyrmont

2-5 years

• Prepare the site to reopen for walking & Cycling from vehicle domain

• Consolidate Functioning Working Harbour

• Stage end - Finish consolidate

Towad by TIME | Stage 1. Landscape Led

3-5 year

• Re-open - Program simple activities on the site (Active the site)

• Increase permeability

• Begain on land and water edge ecology development (PHYTOREMEDIATION)

• Stage end event - Community reconiazed The Bays as open (public) space

Neigbourhood development in surrounding at this stage:

• Rozelle Parkland completed

• New fish market opend

Balmian White Bay Glebe Island
Pyrmont
The Bays Waterfront
Glebe Island Bridge close for repair
Gravel Path
Birrung Park close for repair

Towad by TIME | Stage 1. Landscape Led (cont.)

Booth Street
Under Glebe Island Bridge
Balmian White Bay
Glebe Island Pyrmont
Traffic Plan

Towad by TIME | Stgage 2. Development Led/ Ecology Led

Organize street market

after 5-10 year

• Regular activities will organize

• Open of Birrung Park , Glebe Island Bridge

• Soil toxicity lower to x% (allow sustainable development )

• Stage end event - beginning of Balmain residential & Station development

- The Bays Headland park completed

Neigbourhood development in surrounding at this stage:

• Metro openning

• Blackwattle bay waterfront oppening

Balmian White Bay
The Site
Pyrmont
The Bays Waterfront
Glebe Island Bridge open
Birrung Park Open

Towad by TIME | Stgage 2. Development Led/ Ecology Led (conts.) 2025

Birrung Park

Towad by TIME | Stgage 2. Development Led/ Ecology Led (conts.) 2025

Birrung Park NIGHT

Towad by TIME | Stgage 2. Development Led/ Ecology Led (conts.) 2025

Glebe Island Bridge

Towad by TIME | Stgage 2. Development Led/ Ecology Led (conts.) 2025

Glebe Island Bridge NIGHT

Towad by TIME | Stgage 2. Development Led/ Ecology Led (conts.) 2025

Glebe Island Bridge

Towad by TIME | Stgage 2. Development Led/ Ecology Led (conts.) 2025

Glebe Island Bridge

Towad by TIME | Stage 3. Development Led/ Landscape Led

after 10-20 year

Stage end event - Mix-used development completed on Balmain, WPS, and Waterfront - Compeletion of White Bay Pedestriant Bridge

Neigbourhood development in surrounding at this stage: • -80% compeleted to the Bays

The Bays Waterfront

Towad by TIME | Stage 3. Development Led/ Landscape Led

Propose White Bay Bridge

Towad by TIME | Stage 3. Development Led/ Landscape Led 2030

Propose White Bay Bridge Structure

Towad by TIME | Stage 3. Development Led/ Landscape Led

Propose White Bay Bridge LIGHTING STRATAGE

Towad by TIME | Stage 3. Development Led/ Landscape Led

Propose White Bay Under Bridge

Towad by TIME | Stage 3. Development Led/ Landscape Led

Propose White Bay Under Bridge

Towad by TIME | Stage 4. Development Led/ Ecological

Beyong 30 year

Recreation Cetre Completed

Ecological bridge & better water edge condition

New Tech for cleanning the working harbour

Stage end event - Mix-used development completed on Balmain, WPS, and Waterfron

The Bays Waterfront
Source : Gunyama Park Aquatic and Recreation Centre (2021), Cullinan Ivanov Partnership 2050

Towad

by TIME | Stage 4. Development Led/ Ecological

Waterfront Walk

Towad by TIME | Stage 4. Development Led/ Ecological

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.